United Kingdom. A Pair of Bookends Manufactured from Limestone and Obtained from the Houses of Parliament

Item #M0547-7

Price:

$205
Both bookends in limestone, with a large seal in patinated bronze affixed to the front of each bookend, the left bookend with a seal illustrating the Clock Tower (AKA Big Ben) flanked by flag-bearing spires surrounded by the inscription "THIS STONE CAME FROM THE HOUSES OF PARLIAMENT", the right bookend with a seal illustrating a large Tudor rose surrounded by the inscription "THIS STONE CAME FROM THE HOUSES OF PARLIAMENT", both bookends measure 123 mm in length x 45 mm in width, their heights measuring 148 mm and 150 mm respectively, each with a piece of protective green felt placed on the bottom, exhibiting light discoloration on the limestone due to constant handling. Near extremely fine.

Footnote: The Palace of Westminster was built with a sand-coloured limestone from the Anston Quarry in Yorkshire. In 1839, a committee including the architect Charles Barry, two leading geologists and a stone carver toured the country looking at quarries and buildings. Anston stone was chosen because it was cheaper and could be supplied in blocks up to four feet thick and lent itself to elaborate carving. However, the stone quickly began to decay as a result of atmospheric pollution from coal burning in London and the poor quality of the material used. Although these defects in the choice of stone were visible as early as 1849, very little was done to prevent its decline during the nineteenth century. Barry himself experimented with various compositions on the stone and believed that the decay had been halted.

During the 1920s, it was clear that something had to be done, especially when a large fragment fell off the Victoria Tower and members on the Terrace were advised to sit near the river rather than underneath the main wall of the building. In 1928, it was deemed necessary to use Clipsham stone, a honey-coloured limestone from the Medwells Quarry in Rutland, to replace the decayed Anston. A restoration project began in the 1930s, but it was brought to a halt during the Second World War and was completed only in 1960. The effects of these repair works and the addition of new stone nevertheless began to make the Palace appear like a patchwork quilt. By the 1960s, questions about it were being asked in the House of Commons.

By the 1970s, the effects of pollution were again visible, and a new programme of stone-cleaning and restoration was started in 1981: the north, west, and south fronts, the riverfront and the Clock Tower were completed by 1986. The Victoria Tower, whose cleaning was completed in 1994, was the last part of the exterior to be dealt with. Of the inner courts, the Speaker's Court was the first to be tackled, with the work beginning in January 1994.
 

Shipping Policy: An additional shipping charge may be applicable at or following time of purchase due to size, weight, and/or quantity.